BT

Lakeside selected to protect 15no. BT utility sites nationwide.

Requirements

The bespoke defences required include:

  • Demountable Aluminium Flood Barriers
  • Steel Flood Defence Doors
  • Stainless Steel Flood Gates
  • Stainless Steel Flood Defence Escape Hatches

Overview

Lakeside has been appointed as a sub-contractor to MJ Quinn to carry out the design, supply and installation of flood defences to 15no. BT utility sites nationwide.

Each site has bespoke protection requirements and, subsequently, bespoke design and manufacture demands.

Installation dates

March – December 2022